Post-Storm Damage Inspection at Mohammed Bin Rashid Solar Park 3-Dubai

Shua’a Energy 2 aka MBR 3 is the 3rd phase of Mohammed Bin Rashid Al Maktoum Solar Park in Dubai consists of 800 MW. The plant has over 3 million PV solar panels installed across three Plots A, B, and C.

Industry

Power & utilities

Provided Service

Surveying & 3D Mapping

Project Date

March, 2025

Objective

To conduct a rapid and comprehensive post-storm damage assessment of the full site, after an unseasonal extreme sandstorm in 2025 to identify physical damage to the mounting structures and panels.

Challenges

  • The park spans across 3 plots, totalling 16 km2.
  • Some areas contained a lot of debris and had sand drift accumulation.
  • The client needed the results of the inspection to be delivered in 5 days.

Solution

To overcome these challenges, our aerial inspection team deployed 2 x DJI Matrice 350 with Zenmuse P1 Payload. We executed the flights in less than 3 days and were able to generate a comprehensive report in 1 week

Client Feedback

The prompt mobilisation and accurate report enabled us to act fast and start the work on restoring the power generation of the plant.

Variety of Options

Buma Luna offers a range of drone solutions, from thermal imaging to 3D mapping, tailored to meet the unique needs of the oil and gas sector.

Pre-loaded Animations

Buma Luna offers a range of drone solutions, from thermal imaging to 3D mapping, tailored to meet the unique needs of the oil and gas sector.

behind the scenes

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s,